1.coating body: size: L960xW1200xH2000mm |
|
|
|
|
Commodity |
Details |
3 phases DC heating power supply |
|
Lifting device |
pneumatic units, cylinder, guide pole, guide bar, frame |
vibration system |
vibration motor, connection structure |
electric control system |
time relay, contact, optical grating, ligth etc |
fluidizing box, fixture |
macromolecule micro holes board, steel board etc |
powder cleaning chamber, body frame, light, coating etc |
1.5mm zinc coated sheet, 50*50*2.3mm square rod |
pallet, plastic washer |
|
3 phases DC heating power supply heats the coil; |
at the front side of the operation with pallet with inbuilt plastic washer for stator placing. |
2. two classes powder recycling system: size:L1000xW900XH2000mm |
|
|
Commodity |
Details |
tornado separate tower |
1.5mm cold rolled steel sheet, fluidizing board, powder feeding pump etc |
recycling body |
1.5mm zinc coated sheet, filters, blower |
electric, air control system |
|
torndo separate tower: 1 piece |
|
|
|
|
|
recycling blower: CF-11, 2.25#, 2900RPM, 1 piece |
|
|
|
|
filters: 2 pieces |
|
|
|
|
|
|
pulse control system |
|
|
|
|
|
|
All control apparatus, circuit are DC24v, heating current, voltage take thyristor regulator, and |
safety device is infrared grating. |
|
|
|
|
|
Workflow chart: |
|
|
|
|
|
|
2 stators for coating at one time. |
|
|
|
|
heat and coating are done within 1 minute |
|
|
|
|
heating time is controlled by time relay. |
|
|
|
|
DC current, DC voltage are controlled by thyristor. |
while the rectifier power works, and reaches the required temperature for coating, it stops working, auto start |
cylinder going downward, the stators go to the coating box for coating, vibrating, lifting up and for new ones. |